The works that make a site developable
Water, levels and access decide what a site is worth long before the building does. We take the survey and the catchment and return a grading, drainage and access design that the authority will approve and the contractor can set out on the ground.
What the appointment covers
Services are taken in whole or in part. A client who needs only one of the items below is welcome to appoint us for that item alone.
Site appraisal
Coordination of the topographic survey, interpretation of levels and catchment, and an early statement of what the site will cost to develop.
Grading and earthworks
Platform levels and formation design, cut and fill balanced to keep material on site where possible, with volumes scheduled for pricing.
Stormwater drainage
Catchment and run-off calculation, pipe and channel sizing, attenuation and soakaway design, and an outfall arrangement the authority will accept.
Foul drainage and treatment
Reticulation to the public sewer where one exists, and septic, soakaway or package treatment plant design where it does not.
Water supply
Storage, pumping and distribution within the site, sized against demand and pressure rather than against habit.
Roads and pavements
Horizontal and vertical geometry, pavement build-up on the subgrade actually present, kerbs, drainage and parking layout.
Retaining structures and slopes
Retaining wall design, slope stability assessment on sloping and hillside sites, and the drainage that keeps both standing.
Subdivision layout and servicing
Lot layout, access and turning, and the servicing strategy for water, drainage and power, prepared for approval.
Erosion control and site support
Sediment and erosion control during construction, together with site queries, inspection and the as-built drainage record.
What is issued, and in what form
A civil package comprises a grading and levels drawing, drainage layouts with pipe and invert schedules, longitudinal sections, typical details, and the earthworks and drainage quantities in a form that can be taken straight into a bill.
Setting-out information is given as coordinates and levels against a stated datum, so that the contractor is not left to scale off a drawing.
Standards applied
Drainage is designed to the return period required by the authority, with the catchment, the rainfall intensity and the method of calculation stated on the drawing rather than left implicit.
Pavements are designed against the subgrade actually measured on the site, and the design life assumed is recorded. Where no local standard governs, British or American practice is applied and identified.
Send the survey and the catchment
Tell us where the site is and what you intend to build. We will set out the scope, the programme and the fee before any work begins.